GA D I 3 Patent Prosecution Highway (PPH) based on an IPER established by the EPO as IPEA

301
The PPH enables an applicant whose claims have been determined to be patentable/allowable to have a corresponding application that has been filed with a PPH partner office processed in an accelerated manner while at the same time allowing the offices involved to exploit available work results. 
OJ 2012, 32
OJ 2012, 89
302
Under the PCT-PPH pilot programme at the EPO, a PPH request filed with theone of the other IP5 offices, i.e. JPO, USPTO, SIPO and the USPTOKIPO, or with one of the offices with which the EPO launched bilateral PPH pilot programmes on 1 January 2015, i.e. CIPO (Canada), ILPO (Israel), IMPI (Mexico) and IPOS (Singapore), can also be based on an IPER established by the EPO as IPEA (see point 246). In early 2014 the PCT-PPH programme will be revised. For more information reference is made to points 247 ff.
PCT Newsletter 10/2013, 2
303
Irrespective of the PPH pilot programme any applicant may request accelerated examination under the PACE programme in the procedure before the EPO as elected Office at any time. For more information on the PACE programme reference is made to chapter E (see points 441 ff).
OJ 2010, 352

7 references found.

Click X to load a reference inside the current page, click on the title to open in a new page.

EPO Guide for Applicants, part II Int.

EPO Guide for Applicants, part II Int. - C The EPO as ISA and SISA

EPO Guide for Applicants, part II Int. - D The EPO as an IPEA

EPO Guide for Applicants, part II Int. - E Euro-PCT procedure before the EPO as designated or elected Office

Offical Journal of the EPO